Solar LED Semiflush Reflective Markers (SL-L853T1)

  • Highly visible at night and in bad weather
  • Semiflush snowplow-safe design
  • Aluminum alloy fixture rated for 25 tons PSI
  • High brightness LEDs (5mm diameter)
  • Download Data Sheet (PDF, 374KB)

Description

Compliance

  • IP68 Ingress Protection

Applications

Solar LED Semiflush Reflective Markers are used to delineate roadway curves, roundabouts, pedestrian paths, and school zones for visual recognition.

  • Roadway curves & roundabouts
  • School zones & mid-block crosswalks
  • Pedestrian & bike paths
  • Bridge toll booths: Lane guidance
  • Freeway exit ramps: Wrong-way warning
  • Parking lots: Directional & stop bars

Features

  • Highly visible at night and under adverse weather conditions
  • Semiflush snowplow-safe design
  • Aluminum alloy fixture rated for 25 tons PSI
  • High brightness LEDs (5mm diameter)
  • Visible over 1/2 mile (800m) away
  • Flashing or constant mode
  • LEDs operate all night (dusk to dawn)
  • Integrated reflective section enhances visibility
  • IP68 water and dust resistant
  • Maintenance free
  • Designed to operate in extreme temperatures
  • Easy installation with optional thermoplastic adhesive pad

Data Sheet

Specifications

Specifications

  • Battery Type: Anti-heat NiMH (2.4V/600mA)
  • Operating Hours: 24 to 30 hours after fully charged
  • Battery Charge Time: 4 hours of sunlight
  • Battery Lifespan: 3 to 5 years
  • Solar Panel: Monocrystalline (4V/63mA)
  • Mounting Surfaces: Asphalt, concrete, turf, or dirt
  • Fixture Dimensions: 4″ x 4″ x .75″ (102 x 102 x 20mm)

Installation

Thermoplastic Adhesive Pad Installation Instructions

The optional adhesive pads are a non-toxic, zero VOC, performance thermoplastic adhesive designed to adhere markers to concrete or asphalt. When heated with a propane torch, the pad liquefies and fuses the marker to the pavement surface.

Required Equipment:

  • Propane-fueled torch (Gas Pony or equivalent) with 25 ft hose
  • Adequate propane supply
  • Safety glasses (or face shield), protective gloves, leather boots, long pants

Storage and Handling:

  • Store adhesive pads indoors in a dry location at 35°F to 90°F (2°C to 32°C) and keep them dry prior to installation.
  • Avoid dropping or throwing adhesive pads when ambient temperatures are below 50°F (10°C), as the material becomes less flexible and may crack.

Surface Requirements:

  • Asphalt and concrete pavement
  • Specialty paving surfaces such as brick, cobblestone, or stepping stones
  • Adhesive pads may also be installed over existing adhesive pads when the surface is clean and stable.

The pavement surface must be:

  • Free of dirt, dust, sand, debris, oils or chemical contamination
  • Completely dry prior to installation. If moisture is present, the installation area must be dried using the propane torch before placing the adhesive pad.

Propane Cylinder Safety:

  • Propane cylinders must always be operated in the upright position with the valve at the top.
  • Never lay the propane cylinder on its side, as this may allow liquid propane to enter the torch, creating a hazardous condition.

Installation Procedure:

Step 1 – Surface Preparation

  • Clean the installation area thoroughly. Remove all loose material including dust, sand, and debris.
  • A power blower may be used to clear the surface. The propane torch may also be briefly used to blow debris away from the application area.

Step 2 – Remove Surface Moisture

  • Ensure the pavement surface is completely dry. Surface moisture may not always be visible.
  • Use the propane torch to heat and dry the installation area if necessary.

Step 3 – Position Adhesive Pad

  • Set the adhesive pad in the desired location on the pavement surface.

Step 4 – Heat Adhesive Pad

  • Stand with the wind at your back so heat is directed away from the operator.
  • Using the propane torch, move the flame slowly and evenly across the adhesive pad. Continue heating until the pad becomes soft and molten, allowing it to spread slightly.
  • The adhesive pad must reach its melting temperature to achieve proper bonding with the pavement surface.

Step 5 – Install Marker

  • Immediately after the adhesive pad becomes molten, place the marker onto the adhesive using a gloved hand.
  • Apply gentle pressure to seat the marker into the adhesive pad.
  • Do not press the marker directly against the pavement surface. Maintain a thin layer of adhesive between the marker and the pavement.
  • The molten adhesive should flow into the recessed cavities on the underside of the marker, and flow through the anchor holes on both sides of the marker. This creates a mechanical bond that secures the fixture to the pavement.

Step 6 – Cooling

  • Allow the adhesive pad to cool and solidify. Under normal conditions, the adhesive will set within a few minutes.

Thermoplastic Adhesive Pad Installation Instructions

Ordering Codes

Ordering Codes

Product Code LED Color Combination (Side 1 / Side 2)
SL-L853T1 BB: Blue/Blue
GG: Green/Green
WW: White/White
YY: Yellow/Yellow
 
GY: Green/Yellow
RG: Red/Green
RW: Red/White
RY: Red/Yellow
 
BX: Blue/Blank
GX: Green/Blank
RX: Red/Blank
WX: White/Blank
YX: Yellow/Blank